Clay Manual ยท claymanual.com
Write only what happened. A blank line means you do not have that fact. Do not invent a firing schedule to complete the sheet.
Date
Clay name, manufacturer, and batch or lot
Initial length and unit
Final length and unit
Stage (wet to dry, dry to fired, wet to fired, or a named custom stage)
Glaze product and application notes
Kiln model and controller
Firing or cone information the studio recorded
Observations
Arithmetic example, not a studio test. 100 mm measured later at 88 mm is 12% linear shrinkage for that stage. No clay name or cone belongs in that example.